EarthScape Survey+966 55 679 8661
Englishالعربية

Our Portfolio

Our Survey Projects Across Saudi Arabia

Photos from EarthScape field work: GPR utility surveys on live roads, cable and pipe locating, concrete scanning, PAS 128 trial pits, topographic and GNSS surveys and Electrical Resistivity Tomography (ERT) lines, in cities, plants and open desert across the Kingdom. Request a quote for your project.

GPR and Utility Detection Surveys

Ground penetrating radar and cable locating to map buried services before excavation. Learn about our GPR survey service.

GPR survey and radio-detection cable locating on an open construction plot in Saudi Arabia by EarthScape engineers
GPR survey and cable locating on an open site in Saudi Arabia – performed by EarthScape Technologies Survey
Underground utility detection with GPR along a perimeter fence, with located services marked on the ground
Underground utility detection along a perimeter fence – performed by EarthScape Technologies Survey
Ground penetrating radar (GPR) survey across open desert ground in Saudi Arabia
Ground penetrating radar survey across open desert – performed by EarthScape Technologies Survey
GPR scanning for buried utilities and voids on rough, rocky ground
GPR scanning for buried utilities on rocky ground – performed by EarthScape Technologies Survey
Two surveyors walking GPR grid lines to map buried utilities on a large development site
GPR grid survey on a large development site – performed by EarthScape Technologies Survey
GPR utility mapping beside a fenced industrial compound before excavation
Utility mapping beside a secured industrial compound – performed by EarthScape Technologies Survey
Engineer pushing a ground penetrating radar cart along a city road in Saudi Arabia during a GPR utility survey
GPR survey on a busy city road – performed by EarthScape Technologies Survey
Night-time GPR utility survey on a busy commercial street, with a safety spotter in hi-vis
Night GPR survey on a live street – performed by EarthScape Technologies Survey
GPR survey team scanning across sand dunes, with utility marker flags placed on the ground
GPR survey across sand dunes – performed by EarthScape Technologies Survey

Cable and Pipe Locating

Electromagnetic and radio-detection locating to trace live cables and pipes before any digging starts. See our cable and pipe locating service.

Engineer sweeping a radio-detection cable locator across open ground near a high-voltage substation and power pylons in Saudi Arabia
Cable locating near an electrical substation – performed by EarthScape Technologies Survey
Engineers using a radio-detection cable locator to trace buried cables before excavation
Cable locating with radio detection – performed by EarthScape Technologies Survey
Engineer holding a Radiodetection RD8200 cable locator over disturbed ground beside a boundary wall to trace a buried cable
RD8200 cable locator in use on site – performed by EarthScape Technologies Survey
Engineer using a pipe and cable locator on the floor of an industrial workshop to find buried services before drilling
Pipe and cable locating inside a workshop – performed by EarthScape Technologies Survey
Surveyor tracing underground cables beside an overhead line pole on a rocky desert construction site
Cable locating beside a utility pole – performed by EarthScape Technologies Survey
EarthScape team combining a cable locator, a GPR cart and a GNSS rover to detect and map buried utilities on a desert site
Cable locating with GPR and GNSS on one site – performed by EarthScape Technologies Survey

Indoor GPR and Concrete Scanning

GPR scanning inside plants and buildings, and handheld concrete scanning to find rebar and conduits before coring or cutting. Learn about our concrete scanning service.

GPR survey inside an operating industrial plant, with an engineer scanning beside pipe racks
GPR scanning inside an industrial plant – performed by EarthScape Technologies Survey
Engineer running a GPR cart across the floor of an industrial facility to locate buried services
Indoor GPR scan of a facility floor – performed by EarthScape Technologies Survey
Engineer scanning a concrete wall with a handheld GPR scanner to locate rebar and conduits before coring
Concrete scanning of a wall with GPR – performed by EarthScape Technologies Survey

Trial Pits and Utility Verification (PAS 128)

Hand-dug trial pits that physically confirm the depth and position of located utilities. See our trial pit service.

Hand-dug trial trench exposing buried cables to verify depth and position to PAS 128 quality level QL-A
Trial trench verifying buried cables (PAS 128 QL-A) – performed by EarthScape Technologies Survey
Trial trench exposing a bank of buried utility ducts during utility verification
Utility ducts exposed in a trial trench – performed by EarthScape Technologies Survey
Worker in PPE hand-digging a trial pit to confirm the depth of a utility located by GPR
Hand-dug trial pit to confirm utility depth – performed by EarthScape Technologies Survey
Long trial trench excavated along a site boundary for pre-excavation utility clearance
Trial trenching along a site boundary – performed by EarthScape Technologies Survey
Deep trial pit with a buried cable exposed at the bottom, confirming GPR survey results
Buried cable verified at the base of a trial pit – performed by EarthScape Technologies Survey
Roadside trial trench with traffic management, used for utility clearance before road works
Roadside trial trench for utility clearance – performed by EarthScape Technologies Survey
Trial trench excavation inside safety barriers beside a highway flyover to verify buried utilities
Trial trench excavation beside a highway – performed by EarthScape Technologies Survey
Trial trench exposing a bank of utility ducts, verifying position and depth before construction
Trial trench exposing utility ducts – performed by EarthScape Technologies Survey
Crew hand-digging a trial trench inside barriers to expose and verify buried utilities
Hand-dug trial trench for utility verification – performed by EarthScape Technologies Survey
Crew marking out and hand-digging trial pits inside a barricaded work zone for utility clearance
Marking and digging trial pits – performed by EarthScape Technologies Survey

Topographic, GNSS and Setting-Out Surveys

Total station and GNSS RTK surveys for topographic mapping, control points, setting out and as-built records. Also see our setting-out and as-built survey service and our topographic survey service.

Surveyor operating a total station on a coastal bridge during a topographic and as-built survey
Total station survey on a bridge – performed by EarthScape Technologies Survey
Survey team setting out points with a total station at a facility entrance, behind traffic cones
Setting out with a total station – performed by EarthScape Technologies Survey
GNSS base station and receiver on tripods set up for a topographic survey
GNSS base station for a topographic survey – performed by EarthScape Technologies Survey
Two surveyors collecting GNSS rover points along a boundary wall for a topographic survey
GNSS rover survey along a boundary wall – performed by EarthScape Technologies Survey
GNSS receiver on a survey pole in the desert, with the survey vehicle in the background
GNSS receiver on a desert survey – performed by EarthScape Technologies Survey
EarthScape survey team reviewing GNSS data and planning control points on a desert site
Survey team planning on site – performed by EarthScape Technologies Survey

Electrical Resistivity Tomography (ERT) Surveys

Multi-electrode resistivity lines that image the ground to locate cavities, groundwater, bedrock and soil layers. Read about our ERT survey service.

ERT resistivity meter connected to a multi-electrode cable for an electrical resistivity tomography survey in Saudi Arabia
ERT survey resistivity meter and cable reel – performed by EarthScape Technologies Survey
Electrical resistivity tomography (ERT) instrument and switching unit connected to the electrode cable line
ERT equipment connected to the electrode cable – performed by EarthScape Technologies Survey
ERT data acquisition system with power supply on desert ground, recording ground resistivity
Electrical resistivity tomography data acquisition – performed by EarthScape Technologies Survey
ERT survey line with steel electrodes and cable laid in a straight line across desert ground
ERT electrode line laid across the desert – performed by EarthScape Technologies Survey
Long electrode spread laid out for an electrical resistivity tomography profile
Electrode spread for an ERT resistivity profile – performed by EarthScape Technologies Survey
Electrical resistivity tomography survey line across a flat desert plain for subsurface imaging
ERT survey line for subsurface imaging – performed by EarthScape Technologies Survey
Electrical resistivity tomography (ERT) instrument connected to an electrode line across desert ground
ERT survey line across the desert – performed by EarthScape Technologies Survey
ERT resistivity meter and switching unit connected to a multi-electrode cable in the field
ERT resistivity meter field setup – performed by EarthScape Technologies Survey

Safety and Mobilisation

Every project starts with an HSE induction and careful planning to reach remote sites. About our team.

EarthScape field team in PPE attending an HSE induction before starting survey work on site
HSE induction before survey work – performed by EarthScape Technologies Survey
Survey vehicle on a desert track, mobilising to a remote project site in Saudi Arabia
Mobilising a survey team to a remote site – performed by EarthScape Technologies Survey
EarthScape Technologies Survey field team in PPE, including engineers, surveyors and technicians
EarthScape field team – performed by EarthScape Technologies Survey
Survey vehicle crossing red sand dunes on the way to a remote project site in Saudi Arabia
Mobilising to a desert site – performed by EarthScape Technologies Survey
Scroll to Top