Every structure is only as accurate as the points it was built from. Construction setting out puts the design on the ground in the right place, and an as-built survey shows what was actually constructed. EarthScape Technologies provides setting out surveys, control networks and as-built surveys across Saudi Arabia (KSA), including Riyadh, Jeddah, Dammam, Makkah and Madinah, from our office in Riyadh.

What Are Setting Out and As-Built Surveys?

Survey Control Networks

A control network is a set of stable, accurately coordinated reference points across the site. All setting out and as-built work depends on it. We establish and check control with GNSS, robotic total stations and digital levels, tied to the project’s specified coordinate system.

Setting Out

Setting out transfers design coordinates and levels from drawings to physical marks on site. Typical work includes:

  • Grid lines, column centres and building corners
  • Piles, foundations and anchor bolts
  • Road alignments, curbs, levels and drainage
  • Utility routes, manholes and chambers
  • Boundaries and plot corners as shown on approved plans

As-Built Surveys

An as-built survey measures what has been constructed and compares it with the design. It confirms positions and levels, identifies deviations and creates an accurate record for handover, operation and future works.

Cable and pipe locating Saudi Arabia

Our Method and Equipment

Where wider coverage or more detail is needed, we combine these surveys with a topographic survey, drone survey or 3D laser scanning. Before excavation, buried services can be located with a PAS 128 utility survey.

When Do You Need These Surveys?

  • At project start, to establish and verify site control
  • Throughout construction, for each stage of setting out
  • Before concrete pours or installation, to check formwork, bolts and levels
  • At milestones, to support progress records and quality inspections
  • At completion, to provide as-built drawings for handover and approvals

Deliverables

  • Control network coordinates with station descriptions
  • Setting out records with design and set-out coordinates
  • As-built drawings in AutoCAD and Civil 3D, prepared by our CAD drafting team
  • Deviation reports comparing as-built and design
  • Level and volume checks where required

Accuracy and Quality Checks

We agree the required tolerances at the start and design our methods to meet them. Every setting out point is checked from independent control or by a second measurement before it is handed over, and control is re-checked regularly during the works, because disturbed control is one of the most common causes of setting out errors.

Check the design data

our surveyors review coordinates and drawings first, so errors are caught before they reach the site.

Establish control

control is set up or verified with GNSS and closed traverses, with levels carried by digital levels where height accuracy is critical.

Set out

points are set out with robotic total stations and GNSS, marked clearly and checked independently before handover to the site team.

As-built

constructed features are measured, compared with the design model and deviations are reported.

Design Data Checked First

  • Experienced site surveyors and engineers who check design data first
  • One Team, Set-Out to CAD

  • Setting out, as-built and CAD from one team
  • 5+ Years, 100+ Projects

  • 5+ years of experience, 20+ experts, 40+ clients and 100+ projects delivered
  • Nationwide, Riyadh-Based

  • Projects across Saudi Arabia, managed from our Riyadh office
  • Cable and pipe locating Saudi Arabia
    Safety induction training Saudi Arabia

    Why Choose EarthScape?

    MASW survey Saudi Arabia
    Cable and pipe locating Saudi Arabia

    Setting-Out and As-Built Surveys on Site

    Our survey teams set out design points with total stations and GNSS receivers, then record what was built for accurate as-built drawings.

    Survey team setting out points with a total station at a facility entrance, behind traffic cones
    Setting out with a total station – performed by EarthScape Technologies Survey
    GNSS receiver on a survey pole in the desert, with the survey vehicle in the background
    GNSS receiver on a desert survey – performed by EarthScape Technologies Survey
    EarthScape survey team reviewing GNSS data and planning control points on a desert site
    Survey team planning on site – performed by EarthScape Technologies Survey

    See more field photos in our survey project portfolio.

    Sectors We Serve

    We support construction, energy, mining and environmental projects across Saudi Arabia, from international airports to residential developments, including buildings, roads, utilities and industrial facilities.

    Frequently Asked Questions

    Setting out marks the design on the ground before construction. An as-built survey measures what has been built afterwards and compares it with the design.

    All setting out and as-built measurements are taken from the control points. If control is wrong or disturbed, every point set out from it can be wrong, so we establish it carefully and check it regularly.

    Robotic total stations, GNSS receivers and digital levels, chosen according to the accuracy needed and the site conditions.

    Yes. We measure the completed works and prepare as-built drawings in AutoCAD and Civil 3D, with deviation reports where required.

    Yes. Our office is in Riyadh and we provide setting out and as-built surveys for projects across all regions of Saudi Arabia (KSA).

    Request a Setting Out Quote

    Tell us about your site, the scope and any drawings you have, and our team will reply with a proposal. We serve projects across Saudi Arabia (KSA) from our office in Riyadh.

    Contact us for a quote

    Scroll to Top